Data plotting

Use this form to select some indicator data to plot. It uses SVG (Scaler Vector Graphics) and will require a plugin from http://www.adobe.com/svg

First choose an indicator, then the location and finally the parameter itself.

First plot
First
pick an Indicator
Second
pick a place
Third
pick a parameter
Symbol
Connect points Yes No
Colour
Autoscale time axis Yes No ---- If no, enter Date Range to
Draw gaps in plot if data has gaps of more than days
Plot size Height by Width pixels

Second plot Use the same axis as the first plot or overlay second with another axis
First
pick an Indicator
Second
pick a place
Third
pick a parameter

Symbol
Connect points Yes No
Colour